Capital Project Photos
Architectural Drawings
Frank Knight School
Elizabeth Cady Stanton School
Seneca Falls Middle School Photos
Middle School Architectural Drawings

Architectural drawing of Seneca Falls Middle School's relocated Art Room

Architectural drawing of Seneca Falls Middle School's Production Studio

Architectural drawing of Seneca Falls Middle School's Digital Media classroom

Architectural drawing of Seneca Falls Middle School's renovated Wood Shop

Architectural drawing of Athletic Center’s lobby

Architectural drawing of Seneca Falls Middle School's entrance to Barker Gymnasium
Capital Project Progress Photos
Frank Knight School
January 2026

Steel for the new controlled entrance to Knight School has been erected.

Steel for the new controlled entrance to Knight School has been erected.

Steel workers installing arched ceiling joists at Knight School.

The steel skeleton at Knight School has been erected. Workers will install roof decking next.

This was the Knight School’s Principal’s Office. It will become the new location for the school’s Nursing Office.

This was the first classroom to the right as you entered Knight School. It will be the new location for the Principal’s Office, providing access to the controlled entrance.
December 2025
November 2025

It’s hard to recognize the main entrance to Knight Elementary.

Footers are being dug for new controlled entrance to Knight Elementary.

The front entrance to Knight School has been completely demoed. New footers have been dug and footer frames are being constructed. The new entrance will have visitors entering in the upper right area of this photo.

You are looking at the door to the Knight School Office from inside the office. This area will become the new Nurse’s Office. The floor is being demoed for new sanitary lines.

The new controlled entrance to Knight Elementary will require a small addition. Footers for that new addition have been poured.

October 2025

Exterior demo work has begun on the front entrance to Knight Elementary.

Bricks on the left entrance wall have been removed and saved.

The two wing walls of the front foyer at Knight are being demoed. Temporary walls seal off the rest of the school from construction.

A worker is removing the front foyer glass wall at Knight Elementary.

The front doors, windows, and glass walls at Knight have been removed. On the left, the exterior wall of the Music Room has been demoed too.

Workers are cutting into the brick, forming an additional doorway similar to the one seen on the right side of this photo. These doors will serve as the new “controlled entryway” to the school.

This is an inside view of workers cutting in the additional doorway.
September 2025

The former Knight School Office/Nurses Room has been demoed and is in the process of being redesigned.

Knight School Nurse’s Office redesign.

This block wall, of the classroom to the left as you entry Knight School, will be removed making room for the new Knight School Office. Temporary supports are installed to support the steel ceiling joists.
August 2025
July 2025

One of the big oak trees in front of Knight School is being removed to make room for the new sidewalk, entry way and controlled entrance.

The oak tree to the right of the one being removed will also be taken down.

Workers are erecting Asbestos abatement containment structure at Knight School.

The two oak trees near the front entrance to Knight School have been removed.

Excavation work underway at Knight Elementary, to accommodate the new controlled entrance to the school.
Elizabeth Cady Stanton School
February 2026

Workers have broken through the exterior wall at Stanton. Metal framing will be installed forming the new controlled entryway.

Inside Stanton, workers have constructed a temporary enclosure where the exterior wall has been removed.

Also inside Stanton, the various rooms are being completed. It is estimated that all work at Stanton will be completed by April.
December 2025

New Heating/Air Conditioning piping in the Stanton Office has been installed.

Rough framing has been completed in the Stanton Office. Wood blocking has been set in place to anchor monitors & displays.

The steel structure for the new controlled entrance to Stanton Elementary is taking shape.

Steel is being erected for the new controlled entrance to Stanton Elementary.

Steel is being erected for the new controlled entrance to Stanton Elementary.

Steel is being erected for the new controlled entrance to Stanton Elementary.
October 2025

The concrete floor for the new controlled entryway is ready to be poured.

Workers are installing AC units and ductwork in the relocated Stanton Office.

Workers unloading glycol to be used in the heating system at Stanton Elementary.

The concrete floor for the small addition at Stanton Elementary has been poured

Masons are putting a trowel finish to the new concrete floor at Stanton.

Workers are preparing the base for a new rooftop HVAC unit at Stanton.

Electricians are providing electrical access for the new Stanton HVAC unit.

Workers are installing sealant before the HVAC unit is set in place.

The crane is readied to lift the new HVAC unit onto the Stanton roof.

The new HVAC unit is being lifted

The lift in progress.

The lift in progress.

Fishing the HVAC electrical conduit
September 2025
August 2025

Workers are preparing the forms for the concrete foundation of the Stanton Controlled entryway.

New steel beam being installed at Stanton Elementary. The new beam will support white beams that were previously supported by a block wall (which has been removed).

New walls will be constructed outside of the red lines. This will create a new hallway path for students & staff, around the offices, at Stanton.

Foundation forms are ready for concrete at Stanton. This area will be the new controlled entry passage for the school.

The new hallway around the Stanton Elementary offices is being formed. The hallway will be where the man is kneeling.

The dark gray beam in this photo is new. It will support the white beams at Stanton that were supported by a black wall that has been demoed. This area will be the new Stanton Office.

It’s hard to visualize, but the yellow arrows show the new hallway around the new Stanton Office. This area will be cleaned before school opens. Work will continue on the new office after school re-opens. Students will be separated from all construction work.

These next 3 photos show the new hallway at Stanton Elementary passing around the re-located Stanton Office. This portion of the hall will be temporarily closed to students when school reopens.


July 2025

The wall separating the Stanton Office from the hallway has been demoed. The brick and block wall seen on the left will also be removed to make room for the new office location at Stanton.

Workers are erecting temporary supports to the steel I beams. After the temporary wall is in place, the bearing wall, marked with an X, will be removed. This wall needs to be removed to make space for the relocation of the Stanton Office.

The final load bearing wall at Stanton has been demoed. The former Stanton Office is totally eliminated. Ready for the new design.

Workers are digging the footer for the new addition (Controlled Entry) at Stanton.

Workers are patching the floor where the former load bearing office wall was demoed

Footers are being formed for the new Stanton controlled entryway.

Concrete is being poured into the footers of the new Stanton controlled entryway.
June 2025

Ground prep and demo for the new controlled entry to Stanton Elementary

The new entryway will include a small addition to Stanton Elementary

A new, large catch basin at Stanton is being installed to accommodate storm drainage.

More ground work at Stanton for the small addition of the controlled entryway.

The main entryway to Stanton Elementary has been removed, along with sidewalks.
May 2025

The entrance to Stanton Elementary School has been fenced off for renovation.
This will be the new “controlled entryway” to the School.

While the new “controlled entryway” at Stanton is being constructed, all students and visitors will enter through the old front doors seen here.

The Stanton Office will move to the foyer opposite the old front doors.
The temporary Office location will be in place on May 12.

The new Stanton “Controlled Entry” requires relocation of the Stanton Office. Workers begin demo work on the current office.

Stanton Office Demo

Stanton Office Demo

Stanton Office Demo

Stanton Office Demo

Stanton Office Demo

All interior walls, ceiling tiles, and flooring within the Stanton Office have been removed.

While school was on Memorial Day recess, workers demoed ceilings at Stanton Elementary School.

Demoed Stanton ceilings.

Since a portion of the interior hall has been closed, a temporary exterior door has been installed to serve as an emergency exit.
Seneca Falls Middle School Photos
February 2026

The new Middle School Art Room is taking shape.

In the Middle School Tech Suite, this will be the new digital media production room.

Also in the Middle School Tech Suite, this will be the new wood shop.

This is a current view of the Baker Gymnasium Lobby. Walls, flooring and ceiling work is done. Waiting for display cases and column wrapping

A painter is applying finish paint in the hall outside the new Art Room.

One of the completely renovated Middle School classrooms - new flooring, ceiling, lighting, paint, boards, cabinets and heating units.

Workers are enclosing the Middle School Cafeteria canopy area for work to be undertaken in this space.
January 2026

Framing the walls of the new location for the Middle School Art Room.

New hall display case for the Middle School Art Room.

Workers framing the walls between the Middle School Art Room and the Digital Media Production Room.

This will be the Middle School Digital Media Production Room, located between the Wood Shop and the Art Room.

Framing and blocking walls of the new Middle School Wood Shop.

Looking at the new entrance to Baker Gymnasium. The columns will be wrapped and a display case will be installed to the left of the entryway.

The renovated Baker Gymnasium lobby. The columns will be wrapped and a display case will be installed on the right side.

More Middle School classrooms are being renovated with new heating and ventilators, ceiling, lighting, flooring, paint and casework.

Middle School classroom being re-painted.
December 2025

Workers are removing the temporary wall to the east entrance of the Middle School.

Workers are prepping the floor to Baker Gymnasium to merge with the new Gym Lobby flooring.

The steel for the cafeteria canopy roof is being installed to the right of the main entrance to Baker Gymnasium.

Middle School Baker Gymnasium entrance and cafeteria canopy.

Cafeteria canopy.

Glass separating the Middle School Cafeteria from the Gym Lobby is being installed.

A distinctive ceiling has been installed in the hallway outside the renovated Middle School Tech Suite of rooms.

Workers are installing new windows in the Middle School Cafeteria.

Floor leveling material has been poured in the Baker Gymnasium Lobby. New rubberized flooring will be installed over this material.

More window replacements in the Middle School Cafeteria


More window replacement in the Middle School Cafeteria

The new rubberized flooring is being installed in the Baker Gymnasium Lobby.

You can see the new entrance to the gymnasium in this photo.

Workers connecting heating units in the Baker Gymnasium.

Installing glass partition between the Middle School hallway and the cafeteria.

Workers are installing new rubber flooring outside the entrance to Baker Gymnasium.

Workers are installing new rubber flooring outside the entrance to Baker Gymnasium.

Installing the last new window in the Middle School Cafeteria.

Installing a new window in the redesigned Tech Suite.

Framing continues on the new entrance to Baker Gymnasium - west Middle School entrance.

Workers are enclosing the addition to the west entrance to the Middle School.

This will be the outside dining area for Middle School students. The door leads into the Cafeteria.

The rooms in the Tech Suite in the Middle School are taking form. A block wall will separate the wood shop from the digital media & maker rooms.
November 2025

Steel workers are erecting more steel beams for the remodeled east entrance to the Middle School.

A new rooftop HVAC unit is being hoisted into place above the Tech Suite of rooms at the Middle School.

New wall tiles have been set around the new entrance to Baker Gymnasium.

Tile setters continue to install new wall tile in the vestibule of Baker Gymnasium.

A plumber is roughing in hot & cold water lines in the new Middle School wood shop.

The hallway outside Baker Gymnasium has new wall tiles.

Tile setters are terminating the new Middle School wall tile. Phase 2 of this capital project will see the removal of all the old, light blue wall tile replaced with the larger dark blue tiles.

The new Middle School hallway tiles will have white accent tiles as seen being installed in this photo.

This tile setter is getting close to terminating the new tiles on his side of the Middle School hallway.

A drop ceiling is being installed in the new entrance to Baker Gymnasium.

The lighted doorway is the new entrance to Baker Gymnasium. The worker on the scissor lift is attaching support wires for the ceiling in the renovated lobby of Baker Bymnasium.

Workers are measuring and cutting foam insulation for all the new Middle School heat piping.

Workers are priming the classroom walls in the renovated Middle School Tech Suite.

All Middle School classrooms will be renovated with new rubberized flooring seen here and the next photo.


This Middle School classroom is near completion. New flooring, ceiling, lighting, unit ventilator/heater, casework and paint. Middle school students will occupy this room in the next few days allowing workers to begin demoing & renovating another set of classrooms.

The new entrance to the Middle School Cafeteria. Glass and flooring will be installed soon.

Another Middle School classroom renovations have been completed, with new ceiling, lighting, paint, casework, unit ventilator/heater and flooring.

Workers are installing the ceiling grid in the Baker Gymnasium Lobby.

The Baker Gymnasium Lobby’s ceiling will have wood planking as seen here.

New locker room floor tiles are being installed in the Baker Gymnasium Boys’ Locker room.
October 2025

Renovations to one of the Middle School classrooms -new ceiling, lighting, paint, marker boards, heating units and flooring. All rooms will be renovated.

New hearting/ventilating units being installed in a Middle School classroom.

Installing drain piping in the Middle School tech rooms.

Installing floor boxes for electric and data in the Middle School tech rooms.

Heating & AC ductwork being installed in the newly designed Middle School tech rooms.

Concrete forms for the new addition to the Middle School west entryway.

New temporary student emergency exit ramp from the Middle School Cafeteria. Foundation forms for the new cafeteria canopy nearby.

Under-slab drain pipes have been installed in the Middle School renovated Tech Suite.

The new entrance to the Baker Gymnasium is prepped for new wall tile.

New wall tile is being installed.

Steel framing is being erected around the new west exterior of the Middle School.

The new dust collection system has been installed, servicing the Middle School Tech Suite.
September 2025

The Middle School Cafeteria is back in operation with a fresh and clean look.

Masons are blocking up an exterior opening in the Middle School Tech Suite.

Masons bricking up the Middle School exterior opening.

Workers are erecting forms for the concrete foundation of the renovated Middle School east entryway.

Photo of classroom renovation.

Photo of classroom renovation.

Photo of classroom renovation.

Steel workers are placing and securing a new steel beam over the new entrance to Baker Gymnasium.

Foundation walls for the addition to the west entrance to the Middle School have been poured.

The addition to the west entrance to the Middle School by Baker Gymnasium. The Middle School Cafeteria is to the right.

Foundation forms for a wall to support the Middle School Cafeteria exterior canopy.

Backfilling the west entrance to the Middle School.

This is a temporary emergency exit from the Middle School Cafeteria. It needed to be redirected to allow foundation forms for the new Cafeteria canopy

Middle School Cafeteria exit ramp being moved.

Temporary emergency exit ramp being redirected.

Temporary emergency exit ramp being redirected.

New data room has been created to support the renovated Technology wing of the Middle School.
August 2025

Footers for the extension of the west entrance to the Middle School.

All Middle School tech rooms have been demoed and sections of flooring are under repair.

One of the tech room’s hallway wall has been demoed and flooring repaired.

The floor in the Middle School Nurse’s Office has resurfaced with a leveling compound.

A Middle School Music room floor has been resurfaced and a worker is applying a sealer.

Old blue wall tiles have been removed and new metal studs have been erected in one of the Middle School tech rooms.

The Middle School Cafeteria is taking shape. Workers will be installing new ceiling material & lighting.

Masons are removing blocks and bricks to accommodate a larger door in the redesigned Middle School Tech wing

The new ceiling grid is being installed in the Middle School Cafeteria. The cafeteria is scheduled to re-open for the beginning of the school year.

This electrical panel was previously located inside Baker Gym. It has been moved outside the gym to make room for the new entrance to the gym.

The Middle School Cafeteria is taking shape. The new ceiling grid is up, along with bright, new LED lighting. Air conditioning duct diffusers are also being installed.

A view down the hallway towards the Middle School Cafeteria. The open space to the left are where the old shops & offices used to be.

Another view of the hallway towards the Gym and Cafeteria.

Just beyond the Cafeteria, a new data room has been created to house network equipment for the renovated tech wing.

This open space was the old shops & offices. It will be the new location for the Art, Wood Shop and Digital Media Rooms.

Old unit ventilator/heaters are being removed from a classroom. All these units will be replaced with new units capable of providing air conditioning in the near future.

All new heat piping has been installed above the Middle School hallways. Once the piping is installed, the hallways will have a new ceiling and lighting.

This is a view of the renovated Baker Gym Lobby. The photo shows the expansion of the lobby into the cafeteria and boys locker room.

Foundation reinforcement rods are in place for the new Baker Gymnasium entrance. The space will also have an outdoor cafeteria area.

New wall tile is being installed in the Middle School Cafeteria serving area.

Middle School Cafeteria- new wall tile.

A worker is spackling outside the renovated technology wing in the Middle School.

Renovations in the Middle School technology hallway.

Middle School hallway has been cleaned up after new heating pipes were installed over the summer.

A worker is filling and testing the new heating pipes in the Middle School.

New ceramic tiles being installed in the Middle School Cafeteria.

A worker is grouting tiles in the MS Cafeteria.

The MS Cafeteria serving line will go back in place on 8/29/25

This is the west entrance to the Middle School. Work will continue in this area. This area will not be open for parents, staff or students.

New rubberized flooring has been installed in the Middle School Nurse’s Office.

New rubberized flooring has been installed in the Middle School Nurse’s Office.

The Middle School Tech Suite has been sealed off from the hallway in preparation of students using the hall.

A view of the Middle School Tech Suite from the hallway. The block walls will be receiving the same blue wall tiles as seen in the Cafeteria photos.

The Middle School Cafeteria serving line has been put back in place.

The rest of the Cafeteria is taking shape.

Workers are mounting smoke/fire/CO detectors in temporary locations.

Workers are mounting smoke/fire/CO detectors in temporary locations.
July 2025

Middle School west entry. Workers digging out and prepping for new addition.

More prepping of the ground near the Middle School west entry.

The former metal shop has been emptied and is ready for further demo.

The former wood shop has also been emptied and workers are removing the old wood flooring.

Workers are removing all the old unit heater/ventilators. They will be replaced with new units with air conditioning.

The window in the old metal shop has been removed and a worker is cutting out old metal ductwork.

Middle School classroom has been painted. A new drop ceiling is being installed. New LED lighting has been installed. This room is waiting for a new heater/ventilator/AC unit.

The Middle School hallway ceilings have been removed along with lighting fixtures. New pipes for heating are being roughed in.

Workers have demoed some of the structures outside the Middle School tech rooms.

Masons are blocking up one of the window openings in the former metal shop in the Middle School

Workers are continuing their demo work in the Middle School tech rooms. All the walls where the workers are standing will be removed.

Electricians are running new data lines in the Middle School hallway ceilings.

New heating pipes are being installed in the Middle School hallway ceilings.

Old wall penetration in the metal shop wall has been blocked up.

Small rooms in the Middle School tech wing are being demoed to make space for new, larger rooms.

Another small room in the Middle School tech wing is being demoed.

This wall in the Middle School tech wing will be demoed. Electricians are deactivating an electrical panel.

New Baker Gym Lobby. The former lobby was only the width between the upright steel girders.

Workers are removing a raised concrete pad from what is to become the new location of the Art Room.

Workers are removing a raised concrete pad from what is to become the new location of the Art Room.

An electrician is installing new LED lighting in one of the classrooms.

Workers are removing old floor tiling. A new rubberized flooring will be installed.

A worker is drilling laterals off the main heating pipe. This pipe will be hung above the hallway ceiling.

More of the interior rooms in the Tech Wing have been demoed. All the walls seen here will be removed, making room for a totally new layout.

The old entrance to the gym will be blocked up. Workers are demoing the block for a new gym entrance.

Electricians are preparing to install new parking lot light pole bases in the Baker Gymnasium lot.

Masons are blocking up the old south facing entry to Baker Gymnasium. The new entryway is east facing to the immediate left.

Workers have begun removing all the old light blue wall tiles.

Old blue tiles have been removed.

Once the old blue tiles are removed, these new, larger, tiles will be installed.

Workers continue to connect heating/AC piping above the ceiling near the Middle School Office.

The old Baker Gym entrance has been blocked up and the new entrance has been opened up.

Taping & spackling the Middle School Cafeteria walls.

More old blue wall tile is being removed.

The entire space that included the wood & metal shops, office and storage rooms, has been completely demoed for new rooms.

Hall and Tech room Demo
June 2025

Prepping Mynderse track for recoating.

Track bad spots have been repaired - seen here in the light area.

A plastic tarp has been installed to eliminate overspray of the track.

More plastic screening.

A worker is cutting a new entryway to the Middle School Cafeteria.

New Middle School Cafeteria entry.

A new entry into the cafeteria can be seen from inside.

A worker is measuring for a new exterior window on the west wall of the Middle School Cafeteria.

Workers are cutting through the west wall of the Middle School Cafeteria for a new window.

Workers are installing drywall, forming the walls of the Baker Gym Lobby.

Track surface has been repaired, re-coated and now is being re-lined.

A large opening has been made in the west wall of the Middle School to accommodate a larger entryway.

A view of work in the Middle School Cafeteria

You are in the hallway outside Baker Gym looking towards the new wider entryway.

Black ceiling paint is being sprayed on near the Middle School west entry. This ceiling will be partially exposed.

Photo shows the new Baker Gym entry traffic pattern.

Old, light blue wall tiles are being recommended for removal.

It is recommended that all old light blue tiles throughout the Middle School be replaced with appropriately sized tiles, which is also planned for the Tech wing.

The Wood Shop at the Middle School is being cleared to become the Middle School Art Room.

Worker installing new ductwork in the Middle School Cafeteria.

Electrician pulling wires from the old electrical panel of Baker Gymnasium.

A view looking at the west entry of the Middle School. This will be the new lobby to Baker Gymnasium.
May 2025

Workers are seen here demoing a block wall between the Boys’ Locker Room and the former PE Teacher's Office

During the demoing of a portion of the the Locker Room & PE Teacher Office, asbestos abatement was necessary.
Proper containment areas have been erected.

Another view of the west entrance to the Middle School, looking from the Locker Room through the Cafeteria.

The exit by Baker Gymnasium is visible in this photo. To the right of that exit was the former P.E. Teacher Office.
The exit will be widened, creating a larger foyer as you enter.

Since the Middle School entrance will be wider. The P.E. teacher’s office was eliminated. The shower room for officials needs to be relocated. Plumbers have relocated the shower piping.

This photo shows the old entry door to the gym. The new entry will be relocated to accommodate the larger gym foyer.

The canopy and railing to the west door of the Middle School (Baker Gymnasium) have been removed.

Inside the west door of the Middle School, you see that new interior walls are taking shape.
The metal framing expands the Lobby area of Baker Gymnasium.

Framing for the new entrance to Baker Gymnasium.

The new and expanded lobby outside the Baker Gymnasium.

Classroom renovations. All Middle School classrooms will be renovated. This room has new ceiling grid, lights and paint.

Track re-surfacing has begun. A worker is power washing the old track surface

Power washing

All bad spots in the track surface will be repaired.

Bad spots in the track surface have been cut out and will be repaired before re-surfacing.

Bad spot in the pole vault pit is being dried with a blower.

Bad sections of the “D” area have been cut out.
April 2025

The east side of Baker Gym will be used as a temporary student lunch area, as reservations begin in the Cafeteria

Workers build a partition to isolate Cafeteria & Corridor renovations.

Workers prepare for asbestos abatement, erecting containment barrier.

Demo work has begun at the rear entrance to the middle school.

The last storage container arrives on site.

The hallway walls at the west entrance to the Middle School have been demoed to create a larger vestibule as you enter from that entrance.

Another view of the demoed area.

The east half of the Baker Gymnasium is used as a temporary Cafeteria.

One of the first Middle School rooms has been demoed and is ready for renovations.

All Middle School heating pipes will be replaced. As seen here, a red pail is used to catch leaks in existing pipes.

Workers are draining glycol from heating pipes prior to their removal.